50 years of delivering fast‑track, hurricane‑ready structures across the Gulf Coast. It’s not built, until it’s ProBuilt.
Core‑to‑roof, poured‑in‑place concrete shells for multi‑family, mid‑rise and commercial projects. Engineered for speed, strength and code compliance—so follow‑on trades mobilize weeks sooner.
The Gulf Coast’s gold standard. We cast walls and slabs in a single 24‑hour cycle, cutting labour, carry costs and schedule risk on every floor you add.
ICC‑rated concrete envelopes that shrug off 200 mph winds and slash insurance premiums. Affordable, energy‑efficient and ready for the next storm season.
Integrated pre‑con, BIM coordination and self‑perform crews that keep complex towers and tight‑timeline builds on budget and ahead of schedule—without punch‑list surprises.
Dummy text - 68 ICC‑rated, concrete homes built for wind speeds up to 200 mph. Energy use dropped 38 % versus code minimum—families moved in before the next storm season.
Dummy text - 68 ICC‑rated, concrete homes built for wind speeds up to 200 mph. Energy use dropped 38 % versus code minimum—families moved in before the next storm season.
Dummy text - 68 ICC‑rated, concrete homes built for wind speeds up to 200 mph. Energy use dropped 38 % versus code minimum—families moved in before the next storm season.
Dummy text - 68 ICC‑rated, concrete homes built for wind speeds up to 200 mph. Energy use dropped 38 % versus code minimum—families moved in before the next storm season.
In the first 10 days we workshop goals, run BIM clash detection, and deliver a ROM budget within ±5 % accuracy. Smart tweaks here have cut change orders by 18 % on average.
Our in‑house expediters compile drawings, calculations, and wind‑load data. We’ve achieved 100 % first‑round permit approval for the past five years.
Within 72 hours of permit release, crews mobilise, clear vegetation, install erosion control, and set survey benchmarks.
Laser‑guided grading holds tolerances to ±3 mm; tunnel‑form rigs are assembled so we can pour the first deck on Day 7.
24‑hour wall‑and‑slab cycles deliver a new floor every day, compressing the critical path by an average 22 %. Daily QC reports hit your inbox by 6 a.m.
Final clean, 3rd‑party testing, and warranty binder. 90 % of our projects close with zero punch‑list items; all come with a 12‑month workmanship warranty.
Copyright © 2025 All rights reserved. Design By Lakecode.co